Description
✅ Basic Details:
Total Area: Approx. 200 sqm built
Number of Floors: 2 fl oors (ground + upper)
Rooms: Living room, open kitchen, dining area, 3–4 bedrooms, 2.5 bathrooms, safe room, balcony
Structure: Steel frame with pre-insulated walls
On-site Assembly Time: Up to 30 working days
🧱 Exterior and Structure:
Exterior Walls: Multi-layered cladding system: rock wool insulation, OSB panels, waterproof membrane, wood-look aluminum / colored aluminum cladding
Roof: Sloping aluminum roof with hidden gutters, ready for solar system
Frame: Galvanized steel, according to European and Israeli standards
Openings: External aluminum windows with internal PVC profile, double insulated glass
Exterior Doors: Zero-line double-leaf entrance door, water/sun resistant exterior doors
🏠 Interior:
Interior Walls: Double gypsum and OSB with acoustic insulation
Ceilings: Gypsum ceilings with infrastructure for recessed lighting
Flooring: 120/120 tiles on the lower level, SPC parquet in rooms
Interior Doors: Hidden doors (“Zero Line”) flush with the wall
Kitchen: Allocated area for premium kitchen including electrical, water, range hood, integrated refrigerator preparations
Bathrooms: Full cladding, concealed plumbing, mirrors, vanity cabinet, wall-hung toilets, rain shower heads
⚡ Smart Systems:
Electricity: Full three-phase system, main + secondary electrical panels
Lighting: Smart sockets, LED strips, recessed lighting, magnetic strip in kitchen and stairs
Communication & Data: Preparation for CAT7 network, wireless communication to all parts of the house
Smart Home: Preparation for full smart home system – lighting, blinds, air conditioning, hot water
🚿 Plumbing:
Hot Water: Preparation for electric/solar/smart water heater
Drainage Systems: Concealed internal systems, including preparation for air conditioner drainage and recessed showers
Gas (Optional): Prepared gas channel according to Israeli standard (dependent on external provider service)




